Luton Kitchen Fitters Call 07458 082016
Kitchen Fitters · Luton

Appliance Installation in Luton

Kitchen appliance installation in Luton: integrated appliances, extractors, sinks and washing machines fitted and connected so they work and can be serviced later.

The part of a Luton kitchen nobody photographs is the part that generates the callbacks. Waste runs, isolation valves and access to integrated appliances are decided while the units are going in. They are almost impossible to put right afterwards without taking the kitchen apart.

In the Lewsey Farm and Marsh Farm houses the washing machine and dishwasher usually share one old waste under the sink. That is why they back up into each other. A new kitchen is the moment to give each appliance its own waste and trap, so they drain the way they should.

Good to know

Appliance Installation: straight answers

Can the sink and the washing machine be moved?

Usually, and it is far cheaper to decide it now than later. Moving a sink means a new waste run at the right fall, so the distance to the soil stack is what governs it. In most Luton semis there is a workable route; where there is not, we will tell you before the design is signed off.

Does the extractor have to go outside?

Venting outside is better whenever an outside wall can be reached. A recirculating hood only filters the air and sends it back into the room, so the cooking smells and the steam stay in the kitchen.

Who does the electrics?

A qualified electrician. New sockets and circuits in a kitchen are notifiable work and are certified, which matters when you sell. The kitchen layout tells the electrician exactly where everything needs to go.

Can you fit a gas hob?

The hob is fitted into the worktop as part of the kitchen. Connecting it to the gas supply is legally a job for a Gas Safe registered engineer. They are booked in to connect and test it.

How long does appliance fitting take?

A single swap takes an hour or two. In a full kitchen, the appliances are connected on the last days of the fit. Integrated models take longer because the doors must be hung and aligned.

What decides the cost of connecting appliances?

The number of appliances, whether new wastes or valves are needed, and how easy the pipework is to reach. A like-for-like swap costs least. Moving a washing machine to a new wall needs new pipework.

What's involved

Appliance Installation in Luton: how it is done

01

Integrated appliances

Fitted so they can be pulled out and serviced without dismantling the run. A large number of the integrated appliances we are called to were installed in a way that makes replacing them a joinery job.

02

Isolation valves you can reach

Every appliance gets its own valve somewhere you can get a hand to. A leaking washing machine is then turned off in seconds rather than at the stopcock.

03

Sockets planned with the electrician

Positions agreed at the design stage for where the kettle, toaster and microwave will really sit, then added and certified by a qualified electrician.

04

Old appliances taken away

Old appliances disconnected and removed as part of the fit, so nothing is left behind.

05

Separate wastes for each appliance

Washing machine and dishwasher given their own traps and connections, so one never drains back into the other.

06

What makes quoting easy

A photo of the space under the sink and one of the wall behind the appliances. Tell us what you are fitting and roughly how old the house is. That shows us whether the waste is shared.

Getting your Appliance Installation sorted?

Send a photo or a quick video of the room on WhatsApp. Or ask for a free fixed quote with no obligation. We will tell you straight what the room needs.

More from Luton Kitchen Fitters

Other kitchen services

WhatsApp us